Maplecrete Pumping and Crane Services

Boom Pump

All Services

Get in touch

Fill out my online form.

Concrete Boom Pump Rental in Toronto & the GTA

Need dependable concrete boom pumping—without the scheduling headaches? Maplecrete gets your pour done safely, cleanly, and on time. Our GTA-ready fleet ranges from compact 20–22 m city pumps to 38 m units for longer reach and elevated pours. Book a pump with a certified operator and a crew that respects your site, your neighbours, and your schedule.

Get a fast quote: Tell us the address, pour type, target date/time, and a couple of site photos. We’ll size the right pump and confirm availability.

Why Contractors Choose Maplecrete

Our Boom Pump Fleet & Typical Uses

Below are typical working ranges to help you ballpark the right pump. We’ll confirm sizing from your photos/plan and the pour location.

Pump Size

Vertical Reach (approx.)

Horizontal Reach (approx.)

Ideal For

Common Fold Types

20–22 m

65–72 ft

55–60 ft

Tight city streets, small slabs, basements, backyard pads

Z-fold / R-fold

28–30 m

91–98 ft

80–88 ft

Footings, driveways, small commercial slabs

Roll-fold / Z-fold

32–33 m

105–108 ft

95–100 ft

Foundations, ICF walls, residential decks

Z-fold / 5-section

38 m

124–125 ft

110–118 ft

Mid-rise decks, long-reach residential, commercial pours

Roll-fold / Z-fold

Why fold type matters: Z-fold booms snake into tight spaces with fewer traffic interruptions; Roll-fold is efficient for longer, straighter reaches. We’ll advise the best option once we see your access and pour points.

What We Pump

Residential: footings, walls, ICF, slabs, garages, walkways, patios, pool decks, basement floors.
Commercial: slab-on-grade, tilt-up panels, mezzanines, loading docks, retail buildouts.
Industrial / Infrastructure: equipment pads, trench pours, elevated decks, ramps, retaining walls.

Pricing & Quotes—What Affects the Rate

Every job is different, but your rate generally depends on:

  • Pump size & minimum hours (larger booms have higher minimums).
  • Travel & setup (street occupancy, traffic control, staging).
  • Pour volume & pace (continuous vs. intermittent).
  • Mix design (slump, aggregates, admixtures) and washout handling.

 

Pro tip: Upload site photos (driveway, street, gate/laneway, and pour area) and share any engineer’s sketch. The clearer the info, the more accurate—and economical—our scheduling and sizing.

Permits, Street Setup & Traffic Control

Working on a dense Toronto street or occupying a curb lane/sidewalk? You may need a street/road occupancy permit and traffic control. Maplecrete can coordinate:

  1. Site review: access, outriggers, overhead lines, and pedestrian routes.
  2. Permit guidance: whether your setup triggers a permit and what the city typically requires.
  3. Traffic control plan: cones/signage and, where needed, paid duty officers or flaggers.
  4. Neighbour notice: suggested timelines and best practices to keep the block cooperative.

 

Not every job needs a permit, but when it does, early planning keeps your pour day on schedule. Ask us to include permitting support in your quote.

Safety & Environmental Standards

  1. Outrigger setup & cribbing sized for ground conditions—no shortcuts.
  2. Powerline clearances observed at all times; we’ll reposition rather than risk an unsafe reach.
  3. Wind & weather thresholds monitored; if conditions change, we pause and reset.
  4. Hose handling that protects forms, rebar, and finishes.
  5. Concrete washout control: contained washout, no discharge to storm drains or catch basins, and responsible disposal.

Recent Project Highlights

Backyard slab in North York (20 m city pump). Narrow side yard meant we used a Z-fold boom to reach a rear patio without removing fencing. Set up, pour, and washout finished in under three hours, with zero lawn damage.

 

Mid-rise deck pour in Etobicoke (38 m). We coordinated curb-lane occupation and traffic control to reach a second-storey deck over a tight streetscape. The crew placed 40 m³ with a steady pace and clean finish.

Service Areas

Toronto (Downtown, North York, Etobicoke, Scarborough) • MississaugaBramptonVaughanRichmond HillMarkhamAurora/NewmarketPickering/Ajax/WhitbyOakville/Burlington

 

If you’re just outside the GTA, ask—we often travel for the right schedule and pour size.

FAQ

If your setup occupies a curb lane or sidewalk, a city permit and traffic plan may be required. Share your address and photos and we’ll confirm requirements and timing.

As a rough guide: 20–22 m for tight residential and short reaches; 28–33 m for most foundations and slabs; 38 m for longer reaches or elevated work. We’ll size it precisely from your site details.

The pump with a certified operator, standard setup, pumping time, and basic washout. Travel, minimum hours, traffic control, and special washout handling are quoted as needed.

Proper cribbing, full outrigger extension, powerline clearances, and controlled hose handling. If conditions aren’t safe, we pause and adjust.

We’re a pumping service—order your ready-mix as usual. Tell your supplier you’re pumping and confirm the mix is pumpable.

Yes. We can provide certificates and WSIB clearance on request.

We monitor conditions and coordinate with you. If wind or storms make it unsafe, we’ll work with your crew to reschedule the pour window.

Ready to Book?

Tell us about your pour and upload a few photos—we’ll confirm the ideal boom size, availability, and a clear price.

Prefer to talk it through? Call our dispatch team and we’ll walk you through setup, permits, and timing.

65 meter 5 section RZ-fold

61 meter 5 section RZ-fold

57 Meter rz-fold X-STYLE

50 meter 5 section RZ-fold

47 meter 5 section LRZ-fold

43 meter 5 section RZ-fold

41 meter Roll-Fold

40 Meter 5 Section RZ-Fold

38 Meter 5 Section double z-fold

38 Meter Z-Fold 75% Road Ban

Meta image

38 Meter Z-Fold

33 meter Roll-Fold

38 meter R-Fold

33 meter Z-Fold

32 meter 5 section Double Z-fold

20 meter Z fold

28 meter Z fold

Get A Free Quote / Need a Help ?